![]() |
Quality Building Log Books to CIBSE TM31 | ||||
|
Start - How we work - Our services - References - Need help - About us | ||||
ArticlesThe British Governments attempt to save the PlanetEnglish & The required information to be provided in the
Log-book includes:- Schedules of the floor areas by zone, type
and environmental service The location of the major plant and
equipment, with simple schematics of the
relevant systems i.e. ventilation, heating, cooling, power. Schedules of the installed plant and
equipment input and output power. Descriptions of the operational and control
strategies of the energy consuming services in the building such as the heating
system. Copies of commissioning reports confirming that the building systems have been satisfactorily commissioned. The following articles about CIBSE TM31 building log books are available for download: The British Governments attempt to save the Planet Building Log Book Requirements - Part 1 Building Log Book Requirements - Part 2 Building Log Book Requirements - Part 3 Building Log Book Requirements - Part 4 - available soon
|
|||||
|
Weston Super Mare BS22 7QW England |
|||||
![]() |